Skip to Content
Mate Gauge
  • Products
    • All Products
    • Industrial Inline Gauges
    • MGX Benchtop
    • Accessories
  • Solutions

    Lead Battery                             


    Cast lead strips

    Rolled lead strips

    Lead pasting lines

    Battery Separators

    Discover your Mate Gauge industrial solution and reference install


    Steel and other metals             


    Galvanizing lines

    Slitting lines

    Pickling lines

    Tension levelling lines

    Cold rolling lines

    Building materials                    


    Veneer peeling lines

    Gypsum

    Lithium-Ion                               


    Lithium electrodes

  • Outcomes
    • Scrap Reduction
    • Quality Control
    • Automation
    • Process Optimization
    • Financial Optimization
  • Company
    • About
    • Careers
  • Resources
    • How it works
    • Knowledge Base
    • News & Insights
    • FAQs
    • Build vs. Buy
  • 0
  • Contact Us
Mate Gauge
  • 0
    • Products
      • All Products
      • Industrial Inline Gauges
      • MGX Benchtop
      • Accessories
    • Solutions
    • Outcomes
      • Scrap Reduction
      • Quality Control
      • Automation
      • Process Optimization
      • Financial Optimization
    • Company
      • About
      • Careers
    • Resources
      • How it works
      • Knowledge Base
      • News & Insights
      • FAQs
      • Build vs. Buy
    Contact Us

Can operators be trained to improve quality?

March 2, 2017 by
Can operators be trained to improve quality?
Mate Gauge, Steve Mate

"A bad system will beat a good person every time"

– W. Edwards Deming, Total Quality Management).

William Edwards Deming, one of the pioneers of statistical product quality, thought a lot about solving problems on the factory floor. He came to the conclusion that most problems, at their root, were almost never caused by the people operating the machines.

Denning believed the first step to solving any problem is getting over the idea that it's someone else's fault.

I've had the chance to speak with many process managers. I've always tried to make the case that investing in changing their production systems will have the biggest impact on quality. But it's not always an easy sell.

For example, we recently worked with clients who are trying to standardize performance across plants. They're trying to figure out why one plant is reporting better performance than all the others. But the reason is unclear.

So they're faced with a choice: should they put more resources into operator training at the lagging facilities, or invest in changing their production processes?

If they asked Deming, he'd tell them to do what Peter Scholtes, another pioneer of quality, recommends:

 

"Improvement efforts should focus on systems, processes, and methods, not on individual workers. Those efforts that focus on improving the attentiveness, carefulness, speed, etc., of individual workers — without changing the systems, processes, and methods — constitute a low-yield strategy with negligible short-term results." 

The truth is operators will always be confined to working within the system that management creates.

So any lasting changes to performance will come from changes to the system.

Cheers,
Steve

in News & Insights

Read Next
What you might have missed two weeks ago
Products
Industries
About


  • ​

Contact Us
  • 132-105 Schneider Rd.
    Kanata, Ontario, Canada, K2K 1Y3

  • +1 613-287-0171
  •  info@mategauge.com

Copyright © Mate Gauge